 Eskaton Village:  Structure Built over existing Pool
Right.: Photo of Timber Frame - 50' x 80' timber framed structure.  We designed and built this structure using non-incised pressure treated glu-lam beams.  Frame is pictured below and completed Structure is at Left.

Wine Cabinets for Brasserie Restaurant in Sacramento, CA.  -  Rift cut Oak with Brass screen doors.  Doors are bypass doors. Cabinets built by River City Millwork, Inc. Sacramento, CA.

The cabin my son and I built in Priest River, Idaho, during the summer.  We lived in the 5th wheel to the right while building the cabin. It was a fun project and we had a lot of wild life visitors.  Moose, deer, bear and even a wolf stopped by one morning.

Wells Fargo in Store Branch - Re-laminate Teller line in place

Trilogy Golf Couse Clubhouse - Install Mahogany Ceiling 


Hess Winery, St. Helena
Build and re-build wine tasting bar. Install re-purposed lumber to face.  Back bar cabinets and counter tops.  Concrete tops were subcontracted to another vendor.

Customer service area is pictured below. Remodeled and built on site, Cabinets were built by River City Millwork, Inc.




Master Bath remodel - gut out old bath and build new one within the same existing wall space.  Shower is shown before glass enclosure was installed.

 Wells Fargo History Museum
Old Sacramento, California.  This project consisted of demolition of old space to the existing walls and building historically accurate displays and and structures to match the Wells Fargo brand.  We worked with the Historians and State Parks from the planning stages through completion.  They wanted to open for Christmas and we moved the schedule ahead, so that they were open for Thanksgiving. Museum display fixtures were built by River City Millwork, Inc.
Sacramento, CA.

Master Shower/Bathroom remodel


Slate and Stone Work at Entry of Home, Gig Harbor, 
High Rise Office Remodel for Wells Fargo Corporate properties group.  Complete demolition of existing suite to walls. 7,000 sq. ft. renovation/remodel of 7th floor, Wells Fargo Building, 400 Capitol Mall, Sacramento, CA..  This project set a construction speed record for this building.  From start to finish the project was completed in 71 days.  You can imagine that I had very little sleep on this one.  Most of the work was performed during evening and early morning hours, due to noise restrictions from the occupied floors above and below.

Small Shower Remodel - remove old shower enclosure and build new shower with wall niche, Samammish, WA.
Kitchen and Living Room Remodel, Gut existing rooms to bare walls.  Add structural supports and raise ceiling.  Remove walls to give the area an open kitchen and combined great room concept. Carmichael, CA.

Aloft Hotel, Sunnyvale, CA.
This was a high profile project that included installation of a round reception desk with a concrete top.  Ceiling panels were suspended on wires and had a radius transition into the wall panels.  Layout was done with a laser on the ground, where we made benchmarks for lighting openings and panel centering.  In addition to the desk and panels, we also installed the bar and wall cabinets.




GSA building San Francisco  Passport offices.

Installation of service counters, walls and cubicles in the federal building.

Bullet guard glass was installed by others.